Bathroom And Kitchen Work Culver, Indiana
09/30/2022 HAVING LOW WATER PRESSURE
CULVER, IN
10-13-2022
Bathroom And Kitchen Work Culver, Indiana
09/12/2022 THE IRRIGATION FOR THE YARD IS RUNNING THROUGH THE SOFTNER OF THE HOME THEY WANT THE LINE RERAN DIRECTLY TO THE IRRIGATION SYSTEM
CULVER, IN
10-13-2022
Bathroom And Kitchen Work Culver, Indiana
06/23/2022 INSTALL OUR SUPPLIED AMERICAN STANDARD URINAL IN MAIN DOWNSTAIRS BATHROOM
CULVER, IN
08-25-2022
Bathroom And Kitchen Work Culver, Indiana
07/13/2022 NEW BLADDER TANK AND CONTROLS INSTALLED ON 5-16-22. EVERY NOW AND THEN THE PRESSURE DROPS REAL LOW AND THEN THE UNIT WILL KICK ON AND WATER PRESSURE IS BACK. PLEASE CHECK THE PRESSURE OF THE NEW BLADDER TANK.
Culver, IN
08-25-2022
Bathroom And Kitchen Work Culver, Indiana
07/13/2022 USE A LITTLE FORCE REPLACE DOWNSTAIRS TOILET WITH OUR AMERICAN STANDARD WHITE ELONGATED. $750 ALSO, UPSTAIRS TOILET NOT SHUTTING OFF ALL THE TIME. FILL VALVE OR FLAPPER? CREDIT CARD IN NOTES
CULVER, IN
08-25-2022
Bathroom And Kitchen Work Culver, Indiana
07/29/2022 See Picture For Master Head Kohler Tile Guy Will Have New Holes Cut Will Need To Open Drywall Behind And Raise Heads To New Holes Still Needs Stops And Trap Adapters In All Vanities And Kitchen Second Dishwasher Line Needs 15’ Of 1 1/2 With Trap. Will Need To Open Wall And Tie It Into Washer Box Vent In Basement Will Also Need Pex Line And Stop Roughed In For Dishwasher Other Dishwasher Will Tie Into Sink Disposal Upstairs Also Install Hydrant Out Bathroom Vanity Towards Sewerage Pump Out Front
CULVER, IN
08-08-2022
Bathroom And Kitchen Work Culver, Indiana
07/28/2022 See Picture For Master Head Kohler Tile Guy Will Have New Holes Cut Will Need To Open Drywall Behind And Raise Heads To New Holes Still Needs Stops And Trap Adapters In All Vanities And Kitchen Second Dishwasher Line Needs 15’ Of 1 1/2 With Trap. Will Need To Open Wall And Tie It Into Washer Box Vent In Basement Will Also Need Pex Line And Stop Roughed In For Dishwasher Other Dishwasher Will Tie Into Sink Disposal Upstairs Also Install Hydrant Out Bathroom Vanity Towards Sewerage Pump Out Front
CULVER, IN
08-08-2022
Bathroom And Kitchen Work Culver, Indiana
07/26/2022 See Picture For Master Head Kohler Tile Guy Will Have New Holes Cut Will Need To Open Drywall Behind And Raise Heads To New Holes Still Needs Stops And Trap Adapters In All Vanities And Kitchen Second Dishwasher Line Needs 15’ Of 1 1/2 With Trap. Will Need To Open Wall And Tie It Into Washer Box Vent In Basement Will Also Need Pex Line And Stop Roughed In For Dishwasher Other Dishwasher Will Tie Into Sink Disposal Upstairs Also Install Hydrant Out Bathroom Vanity Towards Sewerage Pump Out Front
CULVER, IN
08-08-2022
Bathroom And Kitchen Work Culver, Indiana
07/25/2022 See Picture For Master Head Kohler Tile Guy Will Have New Holes Cut Will Need To Open Drywall Behind And Raise Heads To New Holes Still Needs Stops And Trap Adapters In All Vanities And Kitchen Second Dishwasher Line Needs 15’ Of 1 1/2 With Trap. Will Need To Open Wall And Tie It Into Washer Box Vent In Basement Will Also Need Pex Line And Stop Roughed In For Dishwasher Other Dishwasher Will Tie Into Sink Disposal Upstairs Also Install Hydrant Out Bathroom Vanity Towards Sewerage Pump Out Front
CULVER, IN
08-08-2022
Bathroom And Kitchen Work Culver, Indiana
07/06/2022 Customer Has A Number Of Projects: Recaulk All Tubs/showers And Sinks (3 1/2 Baths & Kitchen) Install Metal Water Lines To Sinks/toilets/washer Drain Hot Water Tank In Basement Optimize Existing Water Filter System (there Is Minimal Water Pressure) Install Ring Doorbell, Install Faucet In Utility Sink And Check Drain For Slow Flow And Quote On Converting 2 Bathtubs To Showers
Culver, IN
08-01-2022